Wind farm – what is it?

Wind farm – what is it?

A wind farm is a facility for generating electricity from wind energy. It consists of several wind turbines connected by a shared power grid. The turbines convert the kinetic energy of the wind into electrical energy. Modern wind farms have a central control system that coordinates and monitors the individual wind turbines. Depending on location and size, wind farms can consist of anything from a few to several hundred individual turbines. The energy generated is fed into the public power grid via transformers. Wind farms can be built both onshore and offshore.

History of wind energy

The history of using wind power goes back thousands of years. The first documented wind turbine for generating electricity came from a visionary inventor: the Briton James Blyth. His “windmill”, with a diameter of 9 metres, was built in 1887 in Marykirk, Scotland. The story of this turbine illustrates the early prejudices against wind energy: when Blyth offered the villagers the surplus energy to light the main street, they declined – they considered electricity to be “the work of the devil”. Undeterred, Blyth built another turbine that supplied the local hospital, the psychiatric clinic and the dispensary with emergency power.

At the same time, in 1891, the Dane Poul la Cour developed the first wind turbine for commercial electricity generation. In the USA, Charles F. Brush built a 12 kW turbine with a 17-metre rotor in Cleveland in 1888. This pioneering work laid the foundation for modern wind energy.

The first megawatt wind turbine, the Smith-Putnam turbine, was installed in Vermont in 1941. With an output of 1.25 MW and a rotor diameter of 53 metres, it was far ahead of its time – modern turbines only reached similar dimensions in the 1980s.

What is a wind farm? Wind turbines at night

Types of wind farms

Onshore wind farms

Onshore wind farms are the classic form of wind energy use. Modern turbines reach heights of up to 400 metres (with the hub at 300 metres) and outputs of up to 20 MW per turbine. They are transported in individual components by heavy haulage and assembled using special cranes. Germany has been using this technology intensively since the 1990s. The advantages: lower construction costs, easier maintenance and existing grid infrastructure. In recent years, the average hub height has been 140 metres and the rotor diameter up to 160 metres – and the trend is upwards. Delivery and assembly take around one week per turbine.

Offshore wind farms

Offshore turbines stand in water depths of 20 to 50 metres. The first commercial projects started in Denmark in 1991. Today, the turbines reach outputs of 12 to 15 MW. The turbines are pre-assembled in port and transported by special vessels. Installation is carried out using floating cranes. Advantages: constant, stronger winds and no restrictions due to local residents. The turbines are up to 300 metres high, and installation takes several weeks per turbine.

Floating wind farms

This innovative technology makes wind farms possible in water depths of more than 60 metres. The first commercial floating wind farm, “Hywind Scotland”, went into operation in 2017. The turbines are mounted on floating foundations that are anchored to the seabed with mooring chains. The turbines reach outputs of 8 to 10 MW. They are floated from the port to the site. Advantages: use of windy areas far from the coast. The turbines are up to 260 metres high. Japan and Norway are pioneers of this technology.

Airborne wind turbines

This experimental technology is still under development. The concept: wind turbines are held at altitudes of 200 to 800 metres by helium-filled structures or kites. There, the winds are constant and stronger. Initial tests have been conducted since 2015 by companies such as Makani (Google) and SkySails Power. The systems have a potential output of 100 kW to 3 MW. Advantages: minimal land use and use of higher wind speeds.

Mountain wind farms

Wind farms in mountain regions harness the strong winds at high altitude. The first large facility of this kind was built in 2004 in Switzerland on the Gütsch (2,332 m). The turbines have to withstand extreme weather conditions. Transport and assembly are particularly challenging and are often carried out by helicopter. The turbines reach outputs of 2 to 3 MW. Advantages: constant, strong winds and efficient land use. The turbines are usually lower than those on flat land, as the altitude of the site already guarantees wind strength.

LEKO ENERGY: expertise in wind farm planning

LEKO ENERGY supports you in planning and realising your own wind farm. Our experts accompany you from site analysis through to commissioning. Contact us.

Write us an email (opens your email program)

Advantages and disadvantages of wind farms

Impact on agriculture

Wind farms and agriculture complement each other well. The land between the turbines remains available for farming. Farmers benefit from lease income. The access roads improve the infrastructure of the fields. The foundation area per turbine is only around 400–600 square metres. Soil compaction is limited to the crane pads and access roads.

Impact on nature

Modern wind farms take bird flight paths and bat activity into account. Automatic shutdown systems reduce the risk of collision. The turbines are built outside sensitive natural areas. Land use per megawatt is lower than for other forms of energy. Soil sealing remains minimal.

Economic impact

Wind farms create local jobs in maintenance and operation. The wind energy industry is becoming an important economic sector. German technology is exported worldwide. Municipalities benefit from trade tax revenue. Regional value creation increases through service providers and suppliers.

Significance for energy policy

Wind farms strengthen energy independence. Decentralised power generation increases security of supply. Germany is reducing its energy imports and CO2 emissions. Technological leadership secures international competitiveness. Wind energy contributes to price stability in the electricity market.

Conclusion

Wind farms are becoming the backbone of the energy transition. The technology has developed enormously over recent decades. Modern turbines generate clean electricity reliably and cost-effectively. The various designs – from onshore to floating turbines – allow flexible use of different sites. The challenges of planning and permitting are manageable. Germany benefits from wind farms through regional value creation, jobs and energy security.

LEKO ENERGY supports you in the planning and realisation of your wind farm. Our experts accompany you from the initial site analysis through to commissioning. With 15 years of experience, we know the success factors for your project. Professional planning saves time and money. Talk to us about your wind farm plans – together we will develop the optimal strategy.

WE ARE HERE FOR YOU

Contact us

Potsdam
LEKO ENERGY GmbH Kirschallee 65 14469 Potsdam
Augustin Köllner
Sijar Hamid
Dr. Hannes Lenz
Tilman Herweg