Wind energy project development in Germany is experiencing impressive growth. In 2024, 635 wind turbines (including repowering) with a total capacity of 3.25 gigawatts were erected. Wind turbines are frequently built on agricultural land, which allows the land to be used for two purposes.

This dual use offers advantages for everyone involved. Farmers can generate additional income through lease agreements, while most of the land continues to be used for agriculture. Wind farm operators benefit from favourable sites with good wind conditions. Existing infrastructure such as access roads and power lines can be used and expanded, which reduces development costs.

Integrating wind turbines into the agricultural landscape promotes local value creation and strengthens rural regions. It contributes to the energy transition and supports the German government’s goal of generating 80% of electricity from renewable sources by 2030.

Legal framework and state funding

The German government has taken numerous measures to promote the expansion of wind energy. The Renewable Energy Sources Act (EEG) guarantees a fixed feed-in tariff for 20 years, which creates investment security. The Onshore Wind Act (Wind-an-Land-Gesetz) obliges the federal states to designate two per cent of their land area for wind energy by 2032.

Wind energy is of central importance for Germany’s energy security, particularly following the phase-out of nuclear power. It forms the backbone of renewable energy generation and contributes to energy independence. Stable and cost-effective electricity generation from wind promotes economic development and creates jobs in structurally weak regions.

LEKO ENERGY: wind energy on agricultural land

Wind energy project development on agricultural land offers landowners a wide range of benefits. LEKO ENERGY provides you with comprehensive support in the development of wind turbine projects. Contact us.

Write us an email (opens your email program)

Challenges in the planning and construction of wind turbines

Despite the funding, project developers face considerable challenges. Permitting procedures are complex and time-consuming. They can take several years and require extensive expert reports and studies. This increases upfront costs and the financial risk for investors. Wind turbine project development therefore requires a high level of expertise and careful planning.

Nature conservation imposes particular requirements. The effects on birds and bats must be carefully examined. Distance rules for residential areas, infrastructure and nature reserves limit the available land. Noise emissions and shadow flicker must be taken into account to protect local residents.

Technical planning requires expertise in various fields. The optimal positioning of the turbines, the grid connection and the logistics for transporting the large components place high demands on planning.

Public acceptance is crucial. Concerns about changes to the landscape, noise and a possible loss in property values must be taken seriously and addressed.

These challenges serve to protect people and nature. They ensure that wind energy projects are implemented sustainably and in line with the interests of everyone involved.

Wind turbines on agricultural land

LEKO ENERGY: your partner for successful wind energy projects

LEKO ENERGY offers comprehensive support in overcoming the challenges of wind turbine project development. Our experienced team, led by Augustin Köllner and Dr Hannes Lenz, has many years of experience and in-depth specialist knowledge of the industry.

With his background in geography, public law and business administration, Augustin Köllner brings extensive experience in the development of wind and solar projects. His role as a board member of the Brandenburg State Association for Renewable Energy (Landesverband Erneuerbare Energien) ensures excellent networks within the industry and the political landscape.

Dr Hannes Lenz, who holds a doctorate in agricultural economics, combines sound knowledge of renewable energy with a deep understanding of the needs of farmers and landowners. This combination enables us to develop projects that are optimal both technically and economically.

Our team has in-depth knowledge of permitting procedures and environmental law. We carry out all the necessary studies and ensure that projects meet all legal requirements. Through proactive cooperation with authorities and stakeholders, we speed up the permitting process.

We develop innovative solutions to technical challenges in wind turbine project development. Our experts optimise the turbine layout, taking into account all relevant factors such as wind resources, land use and environmental impact. We coordinate the grid connection and plan the logistics for efficient construction.

LEKO ENERGY attaches great importance to community participation and transparency. We develop tailor-made communication strategies to promote public acceptance. By involving local residents and stakeholders at an early stage, we build trust and minimise conflicts.

Our holistic approach ensures that every aspect of the project is taken into account. From site analysis to commissioning, we coordinate all steps and ensure timely and cost-efficient implementation. With LEKO ENERGY as your partner, you benefit from our experience, our network and our commitment to the success of your wind turbine project development.

Wind energy on agricultural land: opportunities and challenges, wind turbines in a field

Conclusion

Wind energy project development on agricultural land offers landowners a wide range of benefits. They can profit from lease income, sell the land at a profit or obtain energy at a reduced price.

This win-win situation benefits landowners, project developers, Germany and, ultimately, climate protection. Dual use creates synergies and helps to achieve climate targets.

Despite the challenges, the growing number of successful projects shows the potential of this technology. Professional wind energy project development is crucial to success.

LEKO ENERGY provides you with comprehensive support in the development of wind turbine projects. Our expertise makes projects possible that benefit everyone involved and drive the energy transition forward. Contact us.

WE ARE HERE FOR YOU

Contact us

Potsdam
LEKO ENERGY GmbH Kirschallee 65 14469 Potsdam
Augustin Köllner
Sijar Hamid
Dr. Hannes Lenz
Tilman Herweg