Choosing the right site is decisive for the economic viability and feasibility of the planned wind turbines. A comprehensive analysis takes numerous parameters into account, from wind conditions and technical requirements to the legal framework.

Site analysis requires in-depth knowledge of local conditions and technical possibilities. Modern analysis methods enable a precise assessment of potential sites. The data obtained forms the basis for investment decisions and subsequent project development.

Examining all relevant site factors at an early stage minimises project risks and optimises the subsequent energy yield. A careful site analysis provides planning certainty and speeds up the permitting procedure. It reveals potential and possible obstacles before major investments are made.

Wind potential and site conditions

Wind potential determines the economic viability of a wind turbine. Germany is divided into three characteristic wind zones. The coastal regions of Schleswig-Holstein and northern Lower Saxony offer optimum conditions, with wind speeds above 5 m/s for at least 50% of the hours in a year. The North German Plain and the low mountain regions reach average wind speeds of 3.3 to 5.7 m/s. These areas are suitable for wind energy projects to a limited extent.

The topography of the site shapes local wind conditions. Obstacles such as buildings, forests or terrain features influence wind speed and direction.

Air density also plays a role in the energy yield. Owing to its higher density, cold air generates more energy than warm air. The altitude of the site also affects air density, which decreases as altitude increases. These physical factors are included in the calculation of the expected energy generation.

Site analysis for wind energy projects: engineer on a wind turbine construction site

Technical and infrastructure requirements

Grid connection plays a central role in site analysis. Individual wind turbines require a connection to the medium-voltage grid (10-30 kV), while larger wind farms require a connection to the high-voltage grid (110 kV). The distance to the nearest grid connection point has a considerable influence on the economic viability calculation. On request, energy suppliers must name the most economical connection point.

Developing the site requires efficient infrastructure. Wide, paved access roads allow large components such as rotor blades and tower segments to be transported. The load-bearing capacity of the roads must be designed for heavy transport. The access roads remain relevant for maintenance work even after the turbines have been erected.

The soil conditions determine the foundations of the turbine. Geological reports assess the stability of the subsoil and its susceptibility to erosion. Soil conditions influence construction costs and the structural design of the foundations. Climatic conditions, such as the risk of icing in the winter months, are also taken into account in the technical planning.

Building regulations form the framework for technical implementation. The municipality’s land use plan must permit wind energy at the site. Height restrictions, distance regulations and technical requirements determine the turbine planning.

LEKO ENERGY: expertise in site analysis for wind energy projects

The requirements for wind energy sites call for professional expertise. LEKO ENERGY supports project developers with systematic site analysis and securing land. Contact us.

Write us an email (opens your email program)

Environmental and emission aspects

Noise emissions are a central aspect of site analysis. The Technical Instructions on Noise Protection (TA Lärm) define binding limits for different categories of area. Thanks to optimised technology, modern wind turbines operate quietly. At a distance of several hundred metres, natural wind noise masks the sound of the turbine in operation.

The nature conservation assessment examines the impact on flora and fauna. Migratory bird routes, breeding grounds of protected species and ecologically sensitive areas influence site selection. The analysis takes seasonal characteristics and local nature conservation requirements into account.

Integration into existing land use requires careful planning. Agricultural land remains largely usable, as wind turbines take up only a minimal amount of ground space. The access roads are often also used for agricultural purposes. Coordination with local farmers creates synergies.

The region’s tourism development is included in the site assessment. In many regions, wind turbines blend harmoniously into the landscape. Involving local stakeholders at an early stage increases acceptance of the projects.

Legal protection and professional site analysis

Securing the site legally requires precise preparatory work. In addition to the actual turbine site, securing land also covers setback areas, access routes and cable routes. Land contracts govern long-term use through purchase or lease agreements. These contracts must take into account all the technical and economic aspects of the project.

The complex requirements for wind energy sites call for professional expertise. LEKO ENERGY supports project developers with systematic site analysis and securing land. With 15 years of experience in developing wind energy projects, our team knows the decisive success factors.

Our experts analyse potential sites according to all relevant criteria:

  • Wind potential and technical feasibility
  • Infrastructure requirements
  • Environmental law requirements
  • Permit eligibility
  • Economic prospects

The team led by Augustin Köllner and Dr Hannes Lenz supports you from the initial site assessment through to successful project implementation. Benefit from our many years of experience and our network in the wind energy industry.

WE ARE HERE FOR YOU

Contact us

Potsdam
LEKO ENERGY GmbH Kirschallee 65 14469 Potsdam
Augustin Köllner
Sijar Hamid
Dr. Hannes Lenz
Tilman Herweg