Wind farm planning: basics, law and technology

FAQ: wind farm planning – 20 frequently asked questions about planning a wind farm

Planning a wind farm is a complex process that takes a wide range of factors into account. From site selection to permitting procedures and technical requirements, there is a great deal to consider at every step. In this FAQ, we answer 20 frequently asked questions about planning a wind farm and provide an overview of the most important aspects of the planning process.

1. What are the first steps in planning a wind farm?

The first steps include selecting a suitable site and preparing a feasibility study. This study analyses wind conditions, environmental conditions, legal requirements and the availability of infrastructure. It serves as the basis for deciding whether the project is economically viable.

2. What requirements must a site meet for a wind farm?

A site for a wind farm should have strong and consistent wind conditions. In addition, environmental requirements must be met, and the distance to residential areas must be large enough to avoid noise nuisance. The availability of infrastructure for the grid connection also plays a decisive role.

3. How long does it take to plan a wind farm?

Planning a wind farm can take between 3 and 5 years. This includes carrying out wind measurements as well as processing permitting procedures and evaluating environmental assessments. Delays can arise from lengthy permitting processes or legal objections.

4. Which permits are required to build a wind farm?

The permit is granted under the Federal Immission Control Act (BImSchG). This includes the building permit and the environmental assessments. As a rule, further permits are also required, for example for the grid connection. These procedures vary depending on the federal state and the site.

5. Who is responsible for granting a permit for a wind farm?

As a rule, the state authorities are responsible for granting permits for wind farms, although in some federal states the districts also handle the permitting procedures.

FAQ: wind farm planning, wind turbines in a meadow

6. How is the wind measured at the site?

Wind measurements are usually carried out using met masts or LIDAR systems. These devices record wind speed and direction over a period of at least one year in order to provide accurate data for planning and the economic feasibility analysis.

7. How are environmental requirements taken into account in planning?

Environmental requirements play a central role in planning a wind farm. Studies of fauna and flora must be carried out to ensure that construction has no negative impact on protected species or habitats. The impact on the landscape is also taken into account.

8. What is repowering?

Repowering refers to the replacement of older wind turbines with modern, more powerful models. This increases the energy yield while fewer turbines are required. Repowering is often more economical than building a completely new wind farm, as existing infrastructure and grid connections can in part be reused.

9. How much does it cost to plan a wind farm?

The planning costs of a wind farm can vary considerably depending on the size of the project and the specific site conditions. On average, they amount to around 10% of the total construction costs, which can run to several million euros per turbine.

10. What role does financing play in wind farm planning?

Wind farms are often financed through a combination of equity and debt capital. Banks and investors examine the economic viability of the project closely before providing capital. Community participation models are also becoming increasingly important.

LEKO ENERGY: advice & support

Are you looking for expert advice and hands-on support in planning your wind farm? Then you have come to the right place. LEKO ENERGY supports you at every step – from site selection and application processing through to the realisation of your project.

Write us an email (opens your email program)

11. How is the profitability of a wind farm calculated?

Profitability is determined by various factors: wind speed, the number of turbines, the efficiency of the turbines and the remuneration for the electricity generated. In Germany, the Renewable Energy Sources Act (EEG) plays a role, as it provides for a guaranteed feed-in tariff for electricity from renewable energy.

12. How many wind turbines does it take for a project to pay off?

The economic viability of a given project depends on various factors, above all the site-specific wind yield potential. For smaller projects, however, proximity to the grid and the specific costs of the grid connection are increasingly decisive. At well-suited sites, even a single wind turbine is often profitable.

13. How long does a wind turbine last?

The service life of a modern wind turbine is usually 25 years. After this period, the turbines can be replaced with new, more efficient models (repowering).

14. What are the advantages of building a wind farm?

A wind farm offers numerous advantages: it helps to reduce CO₂ emissions, promotes regional value creation and creates jobs during the construction and maintenance phases. It also helps to reduce dependence on fossil fuels and to make the energy supply more sustainable.

15. How long does it take to build a wind farm?

Once the planning and permitting phase has been completed, the actual construction of a wind farm usually takes between 6 and 12 months. This depends on the number of turbines and the local conditions.

Wind turbines behind a field

16. What happens to the soil around the wind turbines?

When the foundations, crane pads and access roads for the turbines are built, the soil is sealed or partially sealed. After construction, the temporarily used areas are recultivated. Overall, the aim is to minimise the impact on nature. The areas surrounding the wind turbines continue to be used for agriculture or forestry.

17. How are wind farms connected to the power grid?

Wind farms are connected to the high-voltage grid via substations. The grid connection is planned in parallel with the wind farm and requires approval from the grid operators. The connection to the grid is crucial to the profitability of the project.

18. How is the performance of a wind farm monitored?

Modern wind farms are equipped with digital control systems that continuously monitor the performance and condition of the turbines. These systems detect potential faults at an early stage and help to optimise operation and minimise downtime.

19. How are local residents involved in planning a wind farm?

Local residents are often involved in planning through information events and community participation models. In addition, legislators have created attractive financial participation models for municipalities and residents. Potential impacts such as noise and shadow flicker are also examined in strict permitting procedures.

20. What are the future prospects for wind farm planning?

Wind farm planning faces great opportunities, particularly as a result of technological progress and the growing importance of renewable energy. With the use of larger and more efficient turbines and increasing digitalisation, wind energy will play a key role in the energy supply in the coming years.

Do you need support in planning your wind farm?

If you are looking for expert advice and hands-on support in planning your wind farm, you have come to the right place. LEKO ENERGY supports you at every step – from site selection and application processing through to the realisation of your project. Our experience, our strong network and our commitment guarantee you tailored solutions and smooth implementation.

Contact us today to find out more about our services or to arrange a consultation. Together, we will bring your project across the finish line! We look forward to hearing from you and are happy to help.

WE ARE HERE FOR YOU

Contact us

Potsdam
LEKO ENERGY GmbH Kirschallee 65 14469 Potsdam
Augustin Köllner
Sijar Hamid
Dr. Hannes Lenz
Tilman Herweg